    Cement poles equipment production process of the main issues
    2014-07-21 23:25:01

           Cement pole device production process need to pay attention to what the problem then, Shandong wins Asian machinery to tell you about:

           1, drawing unallocated volumes: 10kV line path length, multi-pole, in the mountains of engineering construction design drawings should be divided volumes, vol specification for the design, materials, form, route maps, main electrical wiring diagram, bar List type diagrams; second volume list for the tower, flat section location map; third volume of mechanical and electrical installation drawings; fourth volume of the tower-type assembly and processing diagram; fifth volume of the tower foundation plans; VI of the budget book. Each volume per volume should have directories.

           2, distribution transformer station area project, flat 10kV line, short circuit 10kV line can regardless of volume.

           3, the design specification of the content should be designed according to the design range, the corridor, the weather conditions, terrain geology, the main material selection, the line arrangement, the main lever type, transport distance, the safety factor wire, grounding type and so on.

           4, the contents of the flat section of the positioning rod-type figure, bar number, Stake, elevation, span, span representatives, horizontal span and vertical span, Tension length, terrain, and is the distance across the intersection, the corner degree arc vertical, safety lines.

           Content 5,10 kV line tower schedules should be rod-shaped, bar number, Stake, elevation, span, span representatives, horizontal span and vertical span, Tension length, soil, topography, major equipment pole , the main cross arm, grounded type, the type and quantity of tension string, the angle in degrees, across so on.

           6,10 kV line should be marked on the road map path lines, pole numbers corner bar, wire models, building on topographic maps, planning areas, etc..

           7, construction drawings, signed and sealed should be complete. A project name in a drawing should be consistent.

           8, the material summarized in the table should be consistent with the material material design drawings.

           9, the wire should meet the safety factor "distribution construction and renovation project designed to differentiate Interim Provisions."

          Shandong Sheng Machinery Co., Ltd. has been dedicated sub-cement products machinery research and development, production and sales, with advanced equipment, superb technology and two years of professional experience, the company has always been at the forefront of research and development center block making machine market development , watching the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, hanging roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported to more than 100 countries and regions.