• Home > Factory News
    Mianshaozhuanji during operation prone to problems
    2015-10-09 22:24:33

    Shandong Shengya Machinery Co., Ltd. specializing in the production of various types of brick, brick machine, brick machine, hollow brick, pavement brick and other equipment of the old brick factory.
     What problems Mianshaozhuanji operation prone process?
    1. The hopper does not feed or feeding, and preventing hopper obstruction;
    2. The operation of the program errors, program operation in strict accordance with the instructions;
    3. Brick strength less than ideal state, vibration time is too short;
    4. Motor fever or burn out the motor overlying material did not clean up, the heat is not timely;
    5. feed hopper blocked, see secret censorship is installed on, whether or not fall into the other debris inside.
     Shandong Shengya Machinery Co., Ltd. has been committed cement products machinery development, production and sales, with advanced equipment, superb technical expertise and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development , concerned about the advanced technology at home and abroad, to develop products for different investment needs of users, mainly block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, telephone poles machine equipment. At present the country with 19 offices and eight foreign branch (Nigeria, Tanzania, Algeria, Kenya, Ethiopia, Cameroon, DRC, Cote d'Ivoire) and exported to more than 100 countries and regions.


    Previous: 没有了

    Next: 没有了

    < a href=" ">在线客服