Unburned brick brick production process must be used in equipment, in the press after the installation is complete need some debugging to ensure that equipment normal operation, to ensure that what problem does not occur in the production process.
First of all, need to adjust the gap between the bottom plate and the blade feeding mechanism, can not be allowed more than 2 mm.
Secondly, it should be for the feeding mechanism of the material cylinder and the bottom surface of the market before the gap assurance in not more than 0.5 mm range.
Mianshaozhuanji need adjustment of feed mechanism of material between the cylinder and the cylinder ring gap distance, for the heights of the orbit also need to adjust, the mold surface should be higher than the height of the chassis of about 1 mm.
Finally, don't forget to adjust the eccentric shaft, so that it can ensure the suppression of more in line with the requirements of green brick.
Shandong wins Asia Machinery Co., Ltd. has been committed to the cement products machinery R & D, production and sales, with advanced equipment, exquisite professional technology and twenty years of practical experience, R & D center is always in the forefront of block forming machine market development, pay close attention to domestic and foreign advanced technology developed for different user demand for investment products, the main building block forming machine, hydraulic flower brick machine, cement pipe machine, mixer, suspended roller machine, wire rod machine equipment. At present the country with 19 offices and six foreign branch (Nigeria, Tanzania, Algeria, Kenya, Mozambique and Ethiopia) and exported to more than 100 countries and regions.