NEWS
Shandong Shengya Machinery Co., Ltd. specializing in the production of various types of brick, brick machine, brick machine, hollow brick, pavement brick and other equipment of the old brick factory.
Brick in the automated production process, when releasing the pressure head and mold frame can not be separated:
1. Cause: deformed or broken mandrel head stuck.
Remedy: Repair or replace core.
2. Failure: indenter seat deformation jammed mandrel.
Remedy: Repair or replace the indenter seat.
3. Cause: brick indenter seat condense too many concrete blocks or other debris, while releasing stuck.
Remedy: regular cleaning of the head seat.
4. Failure: indenter foot gap between the mold core is stuck sand stone.
Remedy: The brick fabrics, to reduce the residual sand stone mask surface; improve mask lifting height, remove part of residual material on the mandrel; if still not solve the problem, you can change the program (in the press for the first time after upgrade first lower mold frame, mention boost head.)
Shandong Shengya Machinery Co., Ltd. has been committed cement products machinery development, production and sale of advanced equipment, superb technical expertise and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development Follow the advanced technology at home and abroad, to develop products for different investment needs of users, mainly block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, telephone poles machine equipment. At present the country with 19 offices and six overseas plants (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.




