NEWS
Precautions Mianshaozhuanji need:
1, when the machine is running, you must install all the protective cover and ground cover.
2, check the electrical grounding line departments to avoid leakage, short circuit and so on.
3, the motor direction is prohibited to stand on, so to avoid the car.
4, the machine has found is not normal, you should immediately check the parking exclusion.
5, in the brick does not start, allowed to start feeding mechanism, so as to avoid overload, loss of billet mechanical phenomenon occurs.
Installation test:
1, the device should be installed on a level concrete foundation with anchor bolts. Brick commissioning staff
2, the installation should pay attention to the main body vertical and horizontal.
3, after the installation check for loose bolts and various parts of the doors are secure host, if requested to tighten.
4, according to the configuration of power equipment, power lines and control switches.
5, checked, empty load test, production test can be carried out properly.
Mianshaozhuanji safe manipulation procedures:
1, in the use of brick machine, it is necessary to settle on a solid place, with brackets or feet creel stable, shall not tire instead of support.
2, each brick machine should be checked before starting clutch, brake, rope, etc. should be good, not a foreign body inside the drum.
3, note that when the hopper is raised, forbids any person pass or stay in the hopper, the hopper should be fixed brick machine work is completed before you leave.
4, in the brick machine operation, tool inserted into the drum is strictly prohibited, to avoid accidents.
5, is prohibited without manipulation, is strictly prohibited without permission to leave work when manipulated.
6, brick machine inspection, should be fixed good hopper to intercept the power.