What we talk about when replacing the mold concrete steps?
1, to be stopped cement brick, cement brick mold removed.
2, a new cement at the bottom of camera shake platform installed under the brick mold mold fixed. When installed under the mold must pay attention to the bottom of the mold rubber damping pads is loose. Or somewhat damaged, should be replaced in time, so you can ensure that the density of the cement pads.
3, the lower mold installed later. Then put on to the next box inside a mold under the mold.
4, will be under the control of the cement brick carriage mold, and the mold box close to the time to stop, tighten the bolts, and then upgrade the mold box slide up and down twice to see slide smoothly.
Shandong Sheng Machinery Co., Ltd has been committed cement products machinery research and development, production and sales, with advanced equipment, professional and technical skills, and two decades of practical experience, the company has always been at the forefront of research and development center block making machine market development , concerned about the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, suspended roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.