NEWS
Use Mianshaozhuanji equipment can be said to us into an era of mechanized brick, which is an important sign of the times. In particular, this brick-making process, compared to traditional brick process easier, the entire production process, eliminating the step of traditional firing at full mechanization of production, we only need to table a reasonable operation and control, it is possible to produce a very high number of unburned.
Cause sent to board stuck "strike" a variety of reasons, Here we give a brief look:
A: brick machine using non-standard size pallets.
Treatment options: Standard sized in accordance with the template, but does not meet the standard size pick out a template.
Two: send board machine frame width adjustment of the gap is too small.
Treatment options: adjust the width of the frame to the right place.
Three: brick machine pallet thickness is too thick, blocking the pallet.
Solution: The frame of the front frame of the plate opening height appropriate heightening can.
There is also a situation is: brick pallet equipment sent to board at the exit of the regular card board.
Fault: brick equipment sent to board shift, sent to board did not consistent with the centerline of the shaking table centerline.
Treatment options: the consistent delivery center line and the center line of plate shaker machine.
Failure II: send the front baffle plate machine deformation irregularities affecting pallet entry and exit.
Solution: Replace the flapper, the flapper flat.
Fault three: brick machine mechanical claw serious rust, can not be fully reset.
Solution: Remove the mechanical claw claw claw core bearings and mechanical processing, can not be replaced with the serious. Allowed to remain flexible and regular lubricating maintenance.
Fault IV: brick machine equipment pallet support plates serious wear and tear, lower than the upper surface of the frame support plate, resulting sent to board at the back will be brought back before the pallet, resulting sent to board pawl can not return.
Solution: Replace the support plate wear strips, so that the plane is higher than the upper edge of the support plate rack height. If it is due to the impact deformation within the frame of the support plate, the support frame to the repair.
Shandong Sheng Machinery Co., Ltd has been committed cement products machinery research and development, production and sales, with advanced equipment, professional and technical skills, and two decades of practical experience, the company has always been at the forefront of research and development center block making machine market development , concerned about the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, suspended roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.




