    How should the conservation of brick
    2014-07-18 23:15:32

    For now, the brick factory generally lower degree of automation, take bricks, tiles are used code manually pressed into brick on brick press continuously removed, placed on a flatbed wagon next brick in transit level not stacked and shipped to the brick yard.

         Can also be removed from the brick press on the conveyor belt, auto transport to the yard, and then manually code bricks. Brick yard should be clean and smooth, gently when stacking. Stacking height of 1.3m or less (ie 12 bricks). Brick Nature Conservancy, start watering every day one week, the next day after watering, curing 28 days Serve. The factory also can conserve two weeks.

         If carried lime brick autoclave curing treatment, then stacking brick in the hot car, brought into the autoclave. Buck requirements generally boost 2 hours, 8 hours rent pressure, antihypertensive two hours at a temperature of 170 ℃, after time, you can remove the brick, parked one week after leaving the factory. As with lime brick below 100 ℃ steam curing, then steam-cured brick into the room, pass into the steam curing 12-24 hours.

         Shandong Sheng Machinery Co., Ltd. has been dedicated sub-cement products machinery research and development, production and sales, with advanced equipment, superb technology and two years of professional experience, the company has always been at the forefront of research and development center block making machine market development , watching the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, hanging roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported to more than 100 countries and regions.


    < a href=" ">在线客服