    Cement brick production problems that need attention
    2016-08-04 01:31:13

    Shandong Shengya Machinery Co., Ltd. specializing in the production of various types of brick, brick machine, brick machine, hollow brick, pavement brick and other equipment of the old brick factory.
    Cement brick production process Notes:
    1, the hopper is easy because the cement board clot, so the material to be over come with the use, storage time should not be too long.
    2, feeding, feed should be noted that there is fighting in the large particle aggregates stirring or other foreign matter (diameter of 2 cm or more), particularly iron and other solid materials, cement brick parts are easily damaged.
    3, check the connection is clean brick panels, bonded material found blocks, you must shovel out before feeding machine floor library.
    4, vibration pressure time must be strictly controlled, if necessary, adjust the feed rate, and pay attention to each step limit is normal, the screws are loose, if unexpected, should be adjusted down.
    5, the hydraulic system should be adjusted to the rated pressure (15-18 MPa), regular cleaning grease filter, oil filter at least once a year, always check the actual fuel tank, if necessary, to make up.
    6, excessive wear sleeve and the column to be replaced alloy cover, make sure the mold box and sides of the head gap substantially, both said, smooth ejection.
    7, hopper bottom plate for consistency with mold plane, some time should be examined using adjusted return after the supply hopper, which can scrape back more than expected, but also to clear the head surface sticky material, the upper and lower blade should be fine, wear Over promptly replace them.
    8, when the first test machine, the pallet must be manually filtered again. Pallet length, thickness error of plus or minus 2mm meters maintained to prevent the card board, sent to board damage.
    9, operation, prevent pallets with items above, if more than the material on the pallet, must be cleared up, otherwise mask the downlink is not in place. At this time, the mold frame and feeding platform is not a plane (Note: the mold frame above platform), feed cart if feeding, they will be feeding ruined the car.
    10, cement brick at work, prohibited non-staff, items near the device, otherwise it will cause casualties and damage to the machine.
    11, cement brick at Chaxiu, work clearing car, prohibited live operation.
    12, the vibration of the spring to regularly update all.
    Shandong Shengya Machinery Co., Ltd. has been committed cement products machinery development, production and sale of advanced equipment, superb technical expertise and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development Follow the advanced technology at home and abroad, to develop products for different investment needs of users, mainly block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, telephone poles machine equipment. At present the country with 19 offices and six overseas plants (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.