• Home > Factory News
    Use winter cement brick equipment should Precautions
    2015-03-26 18:50:00

    Shandong Sheng Machinery Co., Ltd specializes in producing various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
        Winter because of the cold weather especially for cement brick multi-pump station maintenance, especially hydraulic oil to be replaced on the 30th of the following, so that the lower the viscosity of the oil, so the oil is conducive to better circulation, cement brick After starting the engine warm-up to make it five to ten minutes, so that the oil flows unimpeded, generally replaced every three months is recommended, if not required to change the oil, the oil viscosity is too high, or too long and easy to use resulting in slow motion, from shock slow burning motor and other phenomena. Not only caused us a loss, but delay the normal production.
    Shandong Sheng Machinery Co., Ltd has been committed to cement machinery products development, production and sales, with advanced equipment, professional and technical skills, and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development Follow the advanced technology at home and abroad, to develop products for different investment needs of the user, the main block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported to more than 100 countries and regions.


    < a href=" ">在线客服