NEWS
Shandong Sheng Machinery Co., Ltd specializes in producing various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
Mianshaozhuanji equipment running after a week, this time to note that the vibration should check box; to see whether the two axes of the axial vibration during the run box space than 0.8MM, in principle, be able to exceed this distance; check if there are gaps should Mianshaozhuanji timely adjustments to reduce vibration box bearing clearance, no need to adjust the pulley center bolt cover to load without axial clearance and flexible operation prevail, the adjustment is completed at the same time pay attention to be replaced once the oil. Oil surface should not exceed 42mm, Mianshaozhuanji shock me in the course, if there are unusual sounds; Mianshaozhuanji must continue to operate non-stop check should shake the box, in general, are due to lack of oil or bearing damage caused by this phenomenon, vibration and fuel tank must be a good replacement only after working.
Shandong Sheng Machinery Co., Ltd has been committed to cement machinery products development, production and sales, with advanced equipment, professional and technical skills, and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development Follow the advanced technology at home and abroad, to develop products for different investment needs of the user, the main block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported to more than 100 countries and regions.
Previous: How to install mold Mianshaozhuanji




