• Home > Factory News
    Replacement of cement brick mold
    2015-02-13 20:35:42

    Shandong Sheng Machinery Co., Ltd specializes in producing various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
         Here are the steps I took to replace the mold for everyone summed up:

    Is the first device after the demolition of the mold die, and die mold box first rose to hook location bite the hook, and then drop the mold box, when the mold box fell to the bottom stop, will be placed on a pallet mold box, then the mold box rise, the pressure on until the die head and die after exposure to wood pallets down box, then die and die slider full release Remove screw connection block, and then start stripping the motor, then die and Meanwhile whereabouts mold box, to be down to the bottom of the stop, will die next lift. Secondly, the mold box raised to 200mm is stopped, then the bottom of the mold box pallets full pads, remove the fixed mold box of four bolts, start stripping the motor, so that the mold box shoe drop to the bottom, then the mold and the mold box box slider from the mold box carried away. After it is a small cement brick mold replacement is installed, first slide down to the bottom of the mold box, put three pallets on the vibration platform, and then carried to the mold box mold box slider, start lifting motor until the mold box mold box when the slider along with contact stop rising, along with four stations will die column wire springs, with stand stud mounted on slide mold box, remove the vibrating table wooden pallets, start lifting motor, after the die and die slider slight contact, stops rising, with a connection to the die block and die slider loose connection, start lifting motor (reversible), mold box whereabouts of the wooden box after backing out of the mold , then start lifting motor until the die pressure head down into the mold box catchy with this level, stops rising, vibration 3 ~ 5S shutdown on startup, will die connection block screw it, then start lifting motor, observe the mold box between the die and die and whether there is friction jamming phenomenon, if you want to adjust up and down freely between the die and mold box until so far. In fact, the operation is very simple, as long as the first successful replacement later buy new cement brick mold, do not worry about replacement.

    Shandong Sheng Machinery Co., Ltd has been committed to cement machinery products development, production and sales, with advanced equipment, professional and technical skills, and two decades of experience, the company has always been at the forefront of research and development center block molding machine market development Follow the advanced technology at home and abroad, to develop products for different investment needs of the user, the main block making machine, hydraulic tile machine, cement pipe machine, mixer, hanging roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported to more than 100 countries and regions.


    < a href=" ">在线客服