    Use unburned cement brick should pay attention
    2014-11-11 23:08:48

    Shandong Sheng Machinery Co., Ltd specializes in producing various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
          Mianshaozhuanji production of cement bricks energy conservation, waste utilization and environmental protection; cement bricks can make the best raw materials, industrial waste waste refers to the number of related tailings and slag powder and other industrial waste, radioactive elements did not cause the human body injury, can achieve the effect of waste re-utilization of recycling, through the suppression of cement produced unburned brick cement bricks.
    Use unburned cement brick should note the following:
    A cement brick cement board hopper easy because clot, so the material to be over come with the use, not stored for a long time; feeding, feeding should be noted that the mixer can not have large particle aggregates or other foreign matter mixed, especially iron pieces sturdy items, easily damaged machinery;
    2, for hopper bottom should be consistent with the abrasive plane, checks should be adjusted using a certain time after the supply hopper return, both to scrape back more than expected, but also to clear the indenter surface sticky material, the upper and lower blade should be fine, excessive wear should be removable; the initial test machine, manual pallet must be filtered out. Pallet length, thickness error of plus or minus 2mm or less maintained to prevent the card board, will send trigger damage;
    3, the hydraulic system should be adjusted to the rated pressure, regular cleaning grease filter, oil filter at least once a year, always check the actual fuel tank, if necessary, supplement; excessive wear sleeve and the column to replace alloy cover, make sure the mold box and press roughly four sides, both said first gap, smooth mold.
    4. Check whether the connected brick clean, found bonding material blocks, you must shovel out before the end of material fed into the machine base; vibration pressure time should be strictly controlled, adjustable quantity, if necessary, pay attention to each step limit is normal, the screws are loose, if an accident should promptly stop adjustment;
    5, cement brick running, to prevent the pallet with the above items, more than expected if the pallet above, must be cleared up, otherwise the mold frame downside is not in place, then, the mold frame and feeding platform, not a plane, feeding trolley if feeding , they will be feeding the car broke; cement brick at work, prohibited non-staff items near the device, otherwise it will cause casualties and damage to the machine.
    Shandong Sheng Machinery Co., Ltd has been committed cement products machinery research and development, production and sales, with advanced equipment, superb technical expertise and two decades of experience, the company has always been at the forefront of research and development center block making machine market development Follow the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, suspended roller machine, wire rod machine equipment. At present the country with 19 offices and six overseas branch (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.