    8 Steps hollow brick commissioning
    2014-10-30 19:36:30

    Shandong Sheng Machinery Co., Ltd specializes in producing various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
            Hollow brick equipment needed in the production of simple debugging, to introduce the following eight steps to look hollow brick debugging.
         1, start the main motor, press the OK button to drop some rod position (may not exceed 1/2 of the trip), and then press the stop button, press the up button (or press the up button) to stop the piston rod to rise, the number of repetitions times, drain the fuel tank and the air tubing, and also check whether all parts of the hydraulic oil leakage.
         2, the starting pay motors, one at each station manually operated valve, and from the empty rows, check whether all parts of leakage.
        3, after checking all the normal main and auxiliary motor when starting, the mold material was added to the pressure to be pushed into the middle of the table, the alignment of the head, adjust the limit switch position so that the pressure goes up to the right position, press the down button, can be suppressed, according to the press articles set pressure (on pressure adjustment method to adjust) pulled out after pressing the mold to complete the stripping station, press the manual valve handle, the top of the product. Insufficient pressure can be increased when the top no pressure relief valve adjustment set jacking blocks until the top of the product, hold hands template, place the product in the specified location to remove the template, put as mold frame, and then manipulate the manual valve make the template back to the original position, that is repeated the next operation.
        4. Use a wrench to detect various removable and non-fixed locations bolts are loose.
        5. Check the hydraulic system of hydraulic oil, the oil is below the maximum oil level should replenish.
        6, the hollow brick the device is placed in a mold jacking station, adjust the slide, so that the mold sliding lightweight, and die right in the middle of jacking plate, tighten the bolts and slide mold limit.
        7, install pressure gauges, pressure gauge host 40Mpa, 25Mpa pay machine for the gauge.
        8, open the distribution box, check the power cord is plugged in, inching liquid PRESS main motor start button, see the motor rotation direction is consistent with the direction of the pump as standard, otherwise adjust the power connector of any two phases.
         Shandong Sheng Machinery Co., Ltd has been committed cement products machinery research and development, production and sales, with advanced equipment, superb technical expertise and two decades of experience, the company has always been at the forefront of research and development center block making machine market development Follow the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, suspended roller machine, wire rod machine equipment. At present the country with 19 offices and six overseas branch (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.