NEWS
Shandong wins Asian machinery specializing in the production of various types of brick, brick machine, brick machine, hollow brick, brick pavement and other equipment of the old brick factory.
Recently, some customers to inquire our company, that their brick machine equipment is always a problem, it is apparent to know more about the customer's own knowledge about Mianshaozhuanji equipment maintenance is also very important.
Following is a brief talk about the reasons for the failure and the resulting brick machine:
Symptom vibration noise and vibrations occur inside the box becomes weak, and immediately stop to check and found that the shaft runout, initially identified a problem with vibration box, the shock box open and found boxes in oil shock, fever, have been scattered inside the bearing. Brick production experience he appeared in front of loose bricks appear behind dense, low high behind the front, causing the brick machine problem has three reasons: voltage problems, shock box speed can not reach the speed of normal operation of equipment. Cutting fabric inside the car tooth loss, is not an accurate precision cutting. Cloth car must be placed in place to ensure that small hopper raw material can fully into the next car.
Shandong Sheng Machinery Co., Ltd has been committed cement products machinery research and development, production and sales, with advanced equipment, professional and technical skills, and two decades of practical experience, the company has always been at the forefront of research and development center block making machine market development , concerned about the advanced technology at home and abroad, to develop products for the investment needs of different users, there are block making machine, hydraulic tile machine, cement pipe machine, blender, suspended roller machine, wire rod machine equipment. Currently has 19 branch offices and six foreign countries (Nigeria, Tanzania, Algeria, Kenya, Mozambique, Ethiopia) and exported more than 100 countries and regions.




